Performance Record: Summary of Performance Records
Name of Project
Name of Plant Owner
Name of Our Client
Site Location
Scope of our work / Plant Specification
Year of Contract
Year of Completion
Current Project Progress
1
Two 1400 Ton/Hour Boilers and Associated  equipment  for   400  MW generating Units Nº3 & 4

Compañia Anónima de
Admistracion y Fomento
Eléctrico (CADAFE) 

Hitachi Ltd.
(Japan)
El Centro 
Installation of Two 1400 Ton/Hour Boilers and Associated  equipment  for   400  MW generating Units Nº 3 & 4
1978
1983
Completed
2
Two 1400 Ton/Hour Boilers and Associated  equipment  for   400  MW generating Units Nº5

Compañia Anónima de
Admistracion y Fomento
Eléctrico (CADAFE) 

Hitachi Ltd.
(Japan)
El Centro 
Installation of Two 1400 Ton/Hour Boilers and Associated  equipment  for   400  MW generating Units Nº5
1982
1984
Completed
3
Supply of boiber feed pump for Units Nº3 & Nº4

Compañia Anónima de
Admistracion y Fomento
Eléctrico (CADAFE) 

Compañia Anónima de
Admistracion y Fomento
Eléctrico (CADAFE) 

El Centro 
Supply of boiber feed pump for Units Nº3 & Nº4
1979
1979
Completed
4
Supply of boiber feed pump for Unit Nº5

Compañia Anónima de
Admistracion y Fomento
Eléctrico (CADAFE) 

Compania Anonima de Admistracion y Fomento Electrico (CADAFE) 
El Centro 
Supply of boiber feed pump for Unit Nº5
1979
1980
Completed
5
730MW Water Turbines & AC Generators (10 units) Stage II

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

Hitachi Ltd.
(Japan)
Guri
Installation of 730MW Water Turbines & AC Generators (10 units) Stage II
1978
1987
Completed
6
Computer System for above Power House. Guri Hydro Power, Stage II
C A E International

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

Guri
Installation of the Computer System for above Power House. Guri Hydro Power, Stage II
1985
1986
Completed
7
Design fabrication and installation of the Torre Solar monument

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

Guri
Design fabrication and installation of the Torre Solar monument
1985
1986
Completed
8
800,000t/y Hot briqetted iron plant. Work involved dismantling, removal and refurbishing the old plant  and constructing a new  plant  system

Operaciones Al Sur
del Orinoco (OPCO)

Kobe Steel, Ltd. (Japan)
Matanzas
Installation of 800,000t/y Hot briqetted iron plant. Work involved dismantling, removal and refurbishing the old plant  and constructing a new  plant  system
1987
1989
Completed
9
Baffle plate and draft tube plate bending and forming and installation in Power House Nº2 for 12 of units 730  MW  units

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

Guri
Baffle plate and draft tube plate bending and forming and installation in Power House Nº2 for 12 of units 730  MW  units
1989
1990
Completed
10
Water  turbine major Overhaul work of  180 MW  generating units Nº1, 2 and 3 in Power House Nº1

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

Hitachi Ltd. (Japan)
Guri
Water  turbine major Overhaul work of  180 MW  generating units Nº1, 2 and 3 in Power House Nº1
1989
1993
Completed
11
Revamp Guide   Rings on 730 MW generating units Nº19, 15, 14, 20, 16, 17, 13 and 18 in Power House  Nº2

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

Guri
Revamp Guide   Rings on 730 MW generating units Nº19, 15, 14, 20, 16, 17, 13 and 18 in Power House  Nº2
1991
1993
Completed
12
Installation of 12 units of 216  MW FRANCIS type water turbines and 250  MVA generators. Power Station Nº2

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

Hitachi Ltd. (Japan)
Macagua
Installation of 12 units of 216  MW FRANCIS type water turbines and 250  MVA generators. Power Station Nº2
1988
1995
Completed
13
Revamp runner cones of   730  MW  generating units in Power House Nº 2, units  Nº20, 11, 15, 18, 19, 14, 17, 13 & 16

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

Guri
Revamp runner cones of   730  MW  generating units in Power House Nº 2, units  Nº20, 11, 15, 18, 19, 14, 17, 13 & 16
1992
1997
Completed
14
2 units of 86 MW  KAPLAN type turbine and 102  MVA generators. Power station Nº3

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

Marubeni Macainca (For Hitachi Ltd. (Japan))
Macagua
2 units of 86 MW  KAPLAN type turbine and 102  MVA generators. Power station Nº3
1988
1997
Completed
15
Water turbine major overhaul work of 223 MW generating units Nº5 & 6 in Power House Nº1

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

Hitachi Ltd. (Japan)
Guri
Water turbine major overhaul work of 223 MW generating units Nº5 & 6 in Power House Nº1
1997
1998
Completed
16

Manpower supply for repair works in Runner Vanes of 11th Unit (Supply of assistants and welders)

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

Guri

Manpower supply for repair works in Runner Vanes of 11th Unit (Supply of assistants and welders)

Jun-97
Dic-97
Completed
17
Manpower supply for repair works in Runner Vanes of 12th Unit (Supply of assistants and welders)

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

Guri

Manpower supply for repair works in Runner Vanes of 12th Unit (Supply of assistants and welders)

Dic-97
Mar-98
Completed
18

Partial supply of materials, fabrication, painting and assembly of two metallic sliding hall doors in Power House Nº2

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

Macagua

Partial supply of materials, fabrication, painting and assembly of two metallic sliding hall doors in Power House Nº2

Mar-98
Mar-98
Completed
19

Partial supply of materials and painting application for the Overhead Crane of 80 Ton, in Power House Nº2

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

Macagua

Partial supply of materials and painting application for the Overhead Crane of 80 Ton, in Power House Nº2

Mar-98
Mar-98
Completed
20
Partial supply of materials, fabrication, painting and installation of 24 valves niches

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

Macagua

Partial supply of materials, fabrication, painting and installation of 24 valves niches

Jun-98
Jun-98
Completed
21
Replacing of coils and tension rings, Insulation  and Testing of 25 MW F7 Type Gas Turbine Generator of Unit Nº14

Compañia Anónima de
Admistracion y Fomento
Eléctrico (CADAFE) 

Sumitomo Venezuela
El Centro 
Replacing of coils and tension rings, Insulation  and Testing of 25 MW F7 Type Gas Turbine Generator of Unit Nº14
1998
1998
Completed
22

Refurbishment of two floodgates 

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

Guri

Refurbishment of two floodgates

1998
1998
Completed
23
Installation of 2,200,000T/yr DR Plant (Finmet process)
Orinoco Iron C.A.
Orinoco Iron C.A.
Matanzas
Installation of 2,200,000T/yr DR Plant (Finmet process)
1998
2000
Completed
24

Illumination system of warehouses access road

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

Macagua

Illumination system of warehouses access road

1999
1999
Completed
25
Water turbine major overhaul work of 270 MW generating units Nº 4 & 7 in Power House Nº1

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

Guri
Water turbine major overhaul work of 270 MW generating units Nº4  and 7 in Power House Nº1
1999
2001
Completed
26

Painting of two metallic stairways located in the earth preys

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

Guri

Painting of two metallic stairways located in the earth preys

2000
2000
Completed
27
Supply of Air compressor
Puerto La Cruz Refinery
Chiyoda Corporation (Japan)
Puerto La Cruz 
Supply of Air compressor (BCH806 / BCH407/A)
2002
2002
Completed
28
12 Units of  188MW KAPLAN Type Water Turbines and Generators

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

G.E.: Kvaerner: KENSA (Venezuela)
Caruachi
Installation of 12 Units of  188MW KAPLAN Type Water Turbines and generators
2000
2006
Completed
29
Supply and installation of warehouse "C" Type (SEMI-CIRCULAR)       

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

G.E.: Kvaerner: KENSA (Venezuela)
Caruachi
Supply and installation of warehouse "C" Type (SEMI-CIRCULAR)       
2001
2001
Completed
30
Disassembly, Refurbishment and Reassembly for 5 Units 

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

G.E.  NORCAN PROYECTO GURI II (Venezuela)
Guri
Disassembly, Refurbishment and Reassembly for 5 Units 
2002
2005
Completed
31

Manpower supply for removal of rotor’s blocks of Unit Nº13

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

MITSUI DE VENEZUELA, C.A. (For Toshiba)
Guri

Manpower supply for removal of rotor’s blocks of Unit Nº13

2002
2002
Completed
32

Supply, fabrication, and transport of steel irons for the extension of the metallic lining of the aspiration tube of the 18th Unit, in Power House Nº 2

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

Guri
Supply, fabrication, and transport of steel irons for the extension of the metallic lining of the aspiration tube of the 18th Unit, in Power House Nº2
2002
2002
Completed
33

Rehabilitation of valves and pipes of the generator cooling system, Unit Nº19,Power House Nº2.

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

Guri

Rehabilitation of valves and pipes of the generator cooling system, Unit Nº19, Power House Nº2

2002
2003
Completed
34

Repair and assembling of the rotor of the unit Nº13 and corrective measures for the stator, Power House Nº2

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

MITSUI DE VENEZUELA, C.A. (For Toshiba)
Guri

Repair and assembling of the rotor of the unit Nº13 and corrective measures for the stator, Power House Nº2

2002
2003
Completed
35

Rehabilitation of the valves and pipes of the generator’s system of cooling, Unit Nº13th. Power House Nº2

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

Guri
Rehabilitation of the valves and pipes of the generator’s system of cooling, Unit Nº13th. Power House Nº2.
2002
2003
Completed
36

Machining of the holes of the stator’s base, unit Nº19. Power House Nº2

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

MITSUI DE VENEZUELA, C.A. (For Toshiba)
Guri

Machining of the holes of the stator’s base, unit Nº19. Power House Nº2

2003
2003
Completed
37

Overhaul of Unit Nº17th generator. Power House Nº2

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

MITSUI DE VENEZUELA, C.A.  (For Toshiba)
Guri

Overhaul of Unit Nº17th generator. Power House Nº2

2003
2004
Completed
38

Rehabilitation of the cooling system in unit’s Nº14th and 17th, Power House Nº2

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

Guri

Rehabilitation of the cooling system in unit’s Nº14th and 17th, Power House Nº2

2004
2005
Completed
39
Renovation of  Distributed Digital Controls
C. A. La Electricidad
de Caracas (EDC) 
Mitsui & Co.  (Japan) / Mitsui de Venezuela C.A
Tacoa
Renovation of  Distributed Digital Controls for TACOA power station, 3 Units
2004
2006
Completed
40

Replace of the control system for the 80 tons gantry crane

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

Macagua

Replace of the control system for the 80 tons gantry crane

2004
2004
Completed
41
H25 Gas turbine 1st unit project
Electricidad de
Venezuela
(ELEVAL)
Mitsui & Co.  (Japan) / Mitsui de Venezuela C.A  (For Hitachi Ltd)
Valencia
Installation of 25MW TG 
2005
2005
Completed
42
Placement of a guide system for the floodgates car transport of the Hydroelectric Power Station

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

NAVANTIA, S.L.
Macagua

Placement of a guide system for the floodgates car transport of the Hydroelectric Power Station

2005
2005
Completed
43

Runner’s Refurbishment of Units 16th & 20th

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

Guri

Runner’s Refurbishment of Units 16th & 20th

2006
2006
Completed
44
Caracas Railway project - IAFE/  DEPOT project
IAFE (Instituto Autonomo Ferrocarriles del Estado)
Kawaski Plant Systems
Caracas
Installation of DEPOT equipment
2006
2007
Completed
45
Refurbishment for the generator, Unit Nº15

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

ALSTOM Hydro Venezuela S.A.,
Guri
Site work for Refurbishment work of generator
2006
2007
Completed
46
FMO Pellet Plant Expansion Project
C.V.G Ferrominera Oricono, C.A
(FMO))
Kobe Steel, Ltd. Japan / Kobe Steel Venezuela
Matanzas
Site work for pellet plant expansion 
2006
2007
Completed
47
Painting work for Gantry crane

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

Macagua
Painting work for Gantry crane (80ton , 135ton)
2006
2007
Completed
48

Runner’s Refurbishment of Unit Nº9th

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

C.V.G. Electrificacion Del Caroni C.A. (EDELCA)
Guri

Runner’s Refurbishment of Unit Nº9th

2006
2007
Completed
49
Rehabilitation of overhead crane in Powe House Nº1 & Nº2

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

ALSTOM Hydro Venezuela S.A.,
Guri
Site work for rehabilitation of overhead crane in Powe House Nº1 & Nº2
2006
2009
Under construction
50

Reparation of the Runner’s blades, Unit Nº7th

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

C.V.G. Electrificacion Del Caroni C.A. (EDELCA)
Guri

Reparation of the Runner’s blades, Unit Nº7th

2007
2008
Under construction
51
Rehabilitation of 4 units

C.V.G. Electrificación
del Caroní, C.A.
(EDELCA)

ALSTOM Hydro Venezuela S.A. / ALSTOM Power Hydro (France)
Guri
Site work for rehabiltitation 
2007
2011
Under construction
     
       
 
|