MACAGUA II, 216 MW x 12 Units. (FRANCIS) |
- Mechanical:
|
* |
Assembly and installation of stay ring, spiral casing and draft tube liner. |
12 Units. |
* |
Sandblasting and epoxy painting of above. |
12 Units. |
* |
Assembly and installation of water turbine. |
12 Units. |
* |
Assembly and installation of generator. |
12 Units. |
* |
Assembly and installation of governor. |
12 Units. |
* |
Installation of generating Co2 firefighting system. |
12 Units. |
* |
Installation of excitation system. |
12 Units. |
* |
Installation of NGR panels. |
12 Units. |
* |
Assembly and installation of main transformers. |
07 Units. |
* |
Installation of firefighting system for transformers. |
06 Units. |
|
|
|
- Auxiliary Equipment: |
* |
Installation of overhead cranes in power house. |
05 Units. |
* |
Installation of gantry cranes. |
02 Units. |
* |
Installation of chillier units. |
Lot. |
* |
Installation of air conditioning units. |
Lot. |
* |
Installation of air compressor units. |
Lot. |
* |
Intake gates and winches. |
12 Units. |
|
|
|
- Electrical: |
* |
Generator protection transformer and panels. |
12 Units. |
* |
Assembly and installation of IPB. |
20 Units. |
* |
Installation of circuit breakers. |
24 Units. |
* |
Installation of house transformer. |
04 Units. |
* |
Installation of various panels. |
72 Units. |
* |
Installation of battery charger units. |
10 Sets. |
* |
Installation of feeders for overhead cranes. |
1,715 Mts. |
* |
Installation of conduit pipes. |
29,365 Mts. |
* |
Installation of terminal boxes. |
34,500 Kgs. |
* |
Installation of power cables. |
140,615 Mts. |
* |
Installation of control cables. |
103,800 Mts. |
* |
Installation of communication cables. |
7,650 Mts. |
* |
Installation of ground cables. |
3,350 Kgs. |