Guri
II Hydropower Station |
|
Construction
Period: 1978
- 1986. |
|
Project
Name: GURI
HYDRO ELECTRIC POWER STATION STAGE II. |
|
Owner: C.V.G. ELECTRIFICACION DEL CARONI
C.A (EDELCA). |
|
Volume of Installation Work: |
|
|
730 MW water turbine. |
10 Units. |
|
Auxiliary transformers. |
10 Units. |
|
750 tons. overhead cranes. |
02 Units. |
|
Other cranes. |
11 Units. |
|
Distribution panels. |
70 Panels. |
|
Bus Duct (IPB). |
280 Tons. |
|
800 kv GIB. |
05 Units. |
|
Inland transportation. |
60,000 Tons. |
|
Bridge. |
1,000 Tons. |
|
Diesel generator sets. |
03 Sets. |
|
Metal work. |
1,445 Tons. |
|
Piping work. |
1,640 Tons. |
|
Butterfly valves. |
336 Valves. |
|
Strainers. |
125 Tons. |
|
Tanks. |
36 Tons. |
|
Conduit Pipes. |
64,000 Mts. |
|
Power Cables. |
32,000Mts. |
|
Control Cables. |
223,000 Mts. |
|
Cable Trays. |
8,100 Mts. |
|
Load Center. |
170 Panels. |
|
Illumination Units. |
6,500 Units. |
|
Elevators. |
06 Units. |
|
Water Treatment System. |
Complete System. |
|
Co2 Firefighting System. |
Complete System. |
|
|
|
|
Other scope of work: |
 |
- Construction Management. |
|
HPT/VHPC was the Consortium Manager of the entire installation work. The other party installed the generators exciters and the main transformers. The contract of HPT/VHPC was on lump sum basis with escalation except for areas where drawings were not finalized and amount not quantified, such as cables, conduit, piping, trays, illumination, metal works, supports, and the like. Those works not quantified were on fixed unit rate price with escalation. Construction management was of key importance to carry out the contract work. Experienced construction manager was assigned to the project with full responsibility and authority to manage the financial aspect, quality of work schedule. As the labor force was directly hired out from the union hall labor relations and payroll handling was one of the major functions of the organization. At the peak, more than 600 persons were on the HPT/VHPC payroll. |
|
|
 |
- Engineering & Drawings: |
|
* |
Schematic (Isometric) drawing for piping. |
* |
Pre-fabrication drawings. |
* |
Lift drawing. |
* |
Material list. |
* |
Cable list. |
* |
As-built drawing. |
* |
Engineering related to procurement of plant and system. |
|
|
|
 |
- Fabrication and Installation |
|
* |
Metal Work. |
|
Prepared drawings, prefabrication, coating, galvanizing, preassembly, storage, transportation, installation and painting work wherever required. |
* |
Piping. |
|
Prepared drawings, prefabrication, hydrostatic test of piping to be epoxy coated, inner coating, pre-assembly, storage, transportation, installation and painting wherever required. |
|
|
Embedded metal and piping after prefabrication were handed over to the civil contractor for them to install. Exposed items were installed by HPT/VHPC. |
|
|
|
 |
- Transportation |
|
Equipment and materials furnished by the client were unloaded at the port 80 Km away and were transported to the project site by HPT/VHPC. Transportation within the project site, such as from storage area to installation site was implemented by HPT/VHPC as well 600 tons of equipment were handled by HPT/VHPC. Marine transportation of items supplied by HPT/VHPC was also carried out by HPT/VHPC. |
|
|
|
Total
generating capacity 10,300MW Guri,Venezuela |
|
|
|
|
For larger views, click on the images. |
|
|
|
 |
Guri
II Hydro Power: 5 Units |
|
Construction
Period: 2002 - 2005. |
|
Project
Name: GURI HYDRO ELECTRIC POWER STATION
STAGE II – 5 Units. |
|
Owner: C.V.G. ELECTRIFICACION DEL CARONI
C.A (EDELCA). |
|
Purchaser:
GE Hydro (NORCAN). |
|
Scope of Work: |
|
-
Disassembly, Refurbishment and Reassembly
work. |
|
|
|
|
|
For larger views, click on the images. |
|
|
|
 |
Guri
II Hydro Power: No.15 Generator |
|
Construction
Period: 2006 - 2007. |
|
Project
Name: GURI HYDRO ELECTRIC POWER STATION
STAGE II – Rehabilitation work of No.15
generator. |
|
Owner: C.V.G. ELECTRIFICACION
DEL CARONI C.A (EDELCA). |
|
Purchaser:
ALSTOM Hydro Venezuela S.A. |
|
Scope of Work: |
|
- Rehabilitation site work. |
|
|
 |
Guri
Hydro Power: Overhead Crane |
|
Construction
Period: 2006 - 2007. |
|
Project Name: GURI HYDRO
ELECTRIC POWER STATION STAGE I & II –
Renovation of overhead crane. |
|
Owner: C.V.G. ELECTRIFICACION DEL CARONI
C.A (EDELCA). |
|
Purchaser:
ALSTOM Hydro Venezuela S.A. |
|
Scope of Work: |
|
- Renovation site work. |